|
The Kpong Dam, also known as the Akuse Dam, is a hydroelectric power generating dam on the lower Volta River near Akuse in Ghana. It is owned and operated by Volta River Authority. It was constructed between 1977 and 1982. Its power station has a capacity of with all four units running, though the total nameplate capacity is .〔(【引用サイトリンク】url=http://www.vraghana.com/our_mandate/kpong_hydro_plant.php )〕 The project supplements power production from Akosombo Dam, for the smelting of aluminium at VALCO in Tema.〔 The project is located about downstream of Akosombo Dam, and is about from the city of Accra.〔 (【引用サイトリンク】title= Projects: Kpong Hydroelectric Project ) 〕 Because the reservoir upstream of the dam is relatively small, the plant operates as a "run-of-the-river" project, with river flow controlled at Akosombo. The design head of water at the plant is ; the low head required the use of unusually large turbines for their power rating, with a Francis runner diameter of . The powerhouse is long, wide and . The main dam is made of earth with rockfill facing and is high and long. Dikes on the banks are long. The spillway has a design capacity of and has 15 radial gates, each wide by high, with a total length of .〔 (【引用サイトリンク】title= Kpong Hydroelectric Plant ) 〕 The civil contractor for the project was Impregilo of Italy. Other components of the project include a 161 kV switchyard and transmission lines, four villages constructed to house people displaced by the project, and road construction. In addition to power generation, the project provides irrigation water for agriculture, and municipal water supply. Bilharzia is a health hazard in the region which has increased since the construction of the dam. ==References== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Kpong Dam」の詳細全文を読む スポンサード リンク
|